Fuzzy Logic-based PWM Control of a Three-Phase
Synchronous Rectifier for Low-Speed Wind Energy
Conversion
Ika Noer Syamsiana,
1,*
Muhammad Akmal Nashiry,
1
Harrij Mukti Khristiana
1
and Arwin Datumaya Wahyudi
Sumari
2
1
Electrical Power Systems Study Program, Department of Electrical Engineering, State Polytechnic of Malang, Malang 65141, East
Java, Indonesia
2
Office of Special High-Rank Officer, Indonesian Air Force Headquarters, Jakarta Timur, DKI Jakarta, 13870, Indonesia
*Email: ikanoersyamsiana@polinema.ac.id (Ika Noer Syamsiana)
Abstract
Low-speed wind energy conversion systems require an effective power-electronic interface to manage low
and fluctuating generator voltages. In this study, a Mamdani fuzzy logic controller (FLC) for regulating the
Pulse-Width Modulation (PWM) duty cycle of a three-phase synchronous Metal-Oxide-Semiconductor Field-
Effect Transistor (MOSFET) rectifier intended for low-speed wind energy conversion is developed. The
controller employs the voltage error and change in error as its inputs, an inference matrix comprising 15
rules, and duty-cycle correction as its output. The FLC was designed and evaluated in MATLAB/Simulink,
while its circuit-level implementation, including an Arduino UNO model, three IR2110 gate drivers, MOSFET
switching devices, and resistive and resistive–inductive loads, was verified in Proteus. The simulations
investigated the effects of the duty cycle, input voltage, and load variations on the rectifier output. The
maximum DC output remained close to the theoretical value of 64.8 V, with deviations below 2.5% across the
evaluated duty cycle range. The output ripple increased from 1.4–2.2% at a 30% duty cycle to 8.2–9.8% at
duty cycles of 50% and above. This behavior was associated with the absence of a series filter inductor in the
investigated topology. At an AC input voltage of 48 V, the FLC regulated the output close to the 48 V reference.
At an input of 36 V, the controller reached its maximum duty cycle limit because the selected reference
exceeded the achievable conversion range. The results demonstrate the simulation-level feasibility of the
proposed FLC and identify the source voltage, filtering configuration, and rectifier topology as the principal
constraints on voltage regulation.
Keywords: Fuzzy Logic Controller; Mamdani Method; Three-Phase PWM Rectifier; Low-Speed Wind Power Plant;
Voltage Ripple.
1. Introduction
Indonesia’s installed power generation capacity reached 73,461 MW in 2023, approximately 53.7% (39,413
MW) of which still relies on fossil-fuelled steam power plants, raising well-known environmental and
economic concerns.
[1]
Under the 2025–2034 Electricity Supply Business Plan (ESBP), the government targets
69.5 GW of additional capacity, 61% of which (42.6 GW) is planned to come from new and renewable energy,
with wind power contributing approximately 7.2 GW of that share.
[2]
Wind energy is widely regarded as one of
the most technically mature and scalable renewable resources; however, despite a theoretical national
potential exceeding 150 GW, Indonesia’s installed wind capacity remains only a small fraction of that figure,
reflecting how far deployment still lags behind resource availability.
[3]
Much of this shortfall traces to wind
speed characteristics: recent utility-scale site assessments across coastal and inland regions in Indonesia
continue to find viable locations only at moderate hub heights and capacity factors, underscoring that even
the country’s better wind corridors do not resemble the strong, sustained wind regimes assumed by
conventional turbine design.
[4]
The average wind speeds across most of Indonesia, including Malang (up to
approximately 4.5 m/s) and the northern coast of Cirebon (2.7–3.9 m/s), fall in the low-to-moderate category,
a condition shared by many low-wind developing country sites where wind energy conversion systems
(WECSs) must be engineered to extract usable power despite fluctuating, low-amplitude generator outputs.
[5-
7]
Under these conditions, both the maximum-power-point-tracking strategy and the downstream power-
conditioning stage must be designed explicitly around low and variable inputs rather than assumed.
[8,9]
A low-
speed wind power generation design is therefore required to exploit this resource, but the resulting generator
output is inherently unstable in both amplitude and frequency and requires power conditioning before it can
supply a load or a battery bank.
[10]
In a wind energy conversion system, the chain from the turbine to usable power runs through the generator,
the rectifier, and the DC link or load: the turbine converts wind kinetic energy into mechanical rotation; the
generator converts that rotation into three-phase AC; and the rectifier converts the AC into a DC quantity that
can be regulated, stored, or inverted.
[6,10]
The rectifier stage is therefore not a passive afterthought but an
active interface whose behavior determines how much of the fluctuating generator output actually becomes
usable power, a point reinforced by recent studies that pair permanent-magnet synchronous generators with
dedicated rectifier or DC-DC stages specifically to hold the output within a usable voltage band despite wind
speed variation.
[11]
An uncontrolled diode rectifier is simple, inexpensive, and reliable, but it offers no
mechanism to regulate or shape its output; its voltage and current are dictated entirely by the generator and
load conditions.
[12]
A synchronous rectifier built from actively switched MOSFETs, by contrast, adds a
controllable degree of freedom: by adjusting the PWM duty cycle applied to the switching bridge, it becomes
possible to influence the DC-link voltage, the output ripple, the conduction losses, and the response to input or
load disturbances.
[13,14]
Realizing this controllable degree of freedom in practice still depends on component-
level choices that are easy to overlook in a control-oriented design: the switching devices, the printed circuit
board that interconnects them, the gate-driver stage that delivers the PWM command to each MOSFET, and
the microcontroller that generates it.
[15-18]
This flexibility does not mean that the output voltage can be raised
without limit; the achievable range is still bounded by the AC source amplitude, the rectifier topology, and the
energy-storage elements present at the output, so duty-cycle control must be understood as a way of shaping
the output within these physical limits rather than overriding them.
[7,19]
Because a low-speed wind turbine produces a generator voltage that varies with the wind speed and because
the load connected to the rectifier can itself change over time, the PWM rectifier must address two
independent sources of disturbance at once, a challenge widely noted in recent low-voltage-ride-through and
maximum-power-point-tracking reviews of wind energy conversion systems.
[8,9]
An open-loop duty-cycle
setting cannot correct for either disturbance: it can reproduce only the output of the fixed switching pattern
produced for the AC input and load present at that moment.
[20]
Widening the duty cycle also has side effects
beyond simply shifting the average output voltage; in a topology without a series filter inductor, it changes
how long the output capacitor is left to discharge between switching pulses, which in turn affects the ripple
content of the DC output.
[14,19,21]
Similarly, a voltage setpoint that exceeds what the present AC input can
theoretically support will drive any duty-cycle controller toward saturation regardless of how well that
controller is designed, a constraint that surfaces repeatedly in converter-level studies of PMSG-based wind
systems operating away from their rated voltage.
[6,7]
Because the switching stage itself is modeled on a low-
cost, resource-constrained platform, an 8-bit microcontroller together with Proteus-modeled gate-driver and
MOSFET blocks, the controller must also remain simple enough to execute reliably within a fixed control-loop
period, a practical constraint reported in comparable Arduino- and Proteus-based embedded power-control
simulations.
[22,23]
These interaction effects, such as wind-driven input variation, load variation, ripple
sensitivity to the duty cycle, and setpoint feasibility, are practical motivations for moving from an open-loop
PWM pattern to a closed-loop controller that continuously senses the output and corrects the duty cycle in
response.
Rectifier and converter control has traditionally relied on fixed-gain proportional-integral (PI) controllers,
and for good reason, a PI loop is simple to implement, well understood, and adequate when the plant behaves
close to linear around a single operating point.
[14]
The difficulty is that a three-phase PWM rectifier is not such
a plant. Its behavior changes with the duty cycle, input voltage, and load, and it includes inherently nonlinear
and switched dynamics that a fixed-gain PI controller was never tuned to cover.
[14,20,23]
Under these conditions,
a PI controller that performs well at one operating point may respond poorly, oscillate, or require retuning at
another; recent hardware and simulation comparisons on DC-DC and rectifier-adjacent converters
consistently report that a fuzzy controller reaches its target faster and with less overshoot than a comparably
tuned PID or PI loop under the same disturbance.
[23-25]
Fuzzy logic control (FLC) offers an alternative that does
not require a precise mathematical model of the plant; instead, it encodes heuristic, human-like decision rules
that map an observed error and its rate of change directly onto a corrective action, an approach that has also
proven implementable on resource-limited embedded controllers similar to the one used in this study.
[7,22,26]
These characteristics make fuzzy logic a suitable candidate for regulating the PWM duty cycle under nonlinear
and varying operating conditions; this does not, on its own, establish that a fuzzy controller outperforms a
well-tuned PI controller in this particular application, a comparison that lies outside the scope of the present
study.
[8]
Fuzzy-based control of PWM rectifiers and wind energy conversion systems has been explored in recent
years. Direct power control (DPC) combined with fuzzy switching-state selection has been shown to reduce
current total harmonic distortion to as low as 0.31%; an adaptive fuzzy DPC-SVM scheme for hybrid PV/wind
microgrids has reported ripple reductions of up to 80% relative to a conventional PI controller, and a hybrid
fuzzy MPPT strategy has been applied to PMSG-based wind conversion connected to a smart grid.
[27-29]
At the
rectifier level specifically, a type-3 fuzzy logic controller has recently been proposed for the DC-bus voltage
regulation of a three-phase PWM rectifier, reporting shorter settling times and lower overshoot than both a
conventional PI controller and a type-1 fuzzy controller under load transients and regenerative operation.
[14]
A direct comparison between an optimized PI controller and a Mamdani-type FLC for a grid-connected wind
turbine likewise reported improvements in settling time and steady-state error under fault conditions,
whereas a similar comparison for a DC–DC boost converter revealed that the fuzzy controller reduced the rise
time and overshoot relative to a PID controller at the cost of a small increase in steady-state error.
[23-25]
Nonfuzzy approaches, such as a Vienna-rectifier vector control strategy validated on a PMSG test bench under
a variable wind profile and a dq-transform double-loop controller with a stepped voltage-setting strategy,
have also achieved fast, low-overshoot regulation, and broader reviews of WECS power-converter control
continue to catalog MPPT, DPC, and intelligent control variants without converging on a single preferred
approach for low-speed, low-cost installations.
[6,7,8,20]
These studies are validated primarily in
MATLAB/Simulink, where a physical rectifier is used at all, target grid-connected or DPC/MPPT-based control
objectives; comparatively little work applies a Mamdani FLC directly to the duty-cycle regulation of a stand-
alone, low-speed wind rectifier with an explicit, block-by-block account of the switching hardware that the
fuzzy output ultimately has to drive.
[13]
Reviewing this literature against the specific rectifier investigated here points to a research gap along several
concrete lines. First, studies that apply a Mamdani-type FLC to generate the duty-cycle correction of a three-
phase synchronous MOSFET rectifier, with the controller’s rule base verified independently of the closed-loop
simulation, remain limited; most fuzzy-rectifiers work instead of reporting either DPC/DTC switching-state
selection or current-loop control in the dq frame.
[20,27]
Second, the combined effect of the duty cycle, input-
voltage, and load-type variation on the same rectifier output has rarely been characterized together within a
single, consistent test matrix; most reports vary one factor while holding the others at a single nominal value,
including several of the PMSG voltage regulation and low-voltage-ride-through studies cited above.
[9,11].
Third,
the ripple-plateau behavior that emerges specifically in a synchronous rectifier without a series filter
inductor, where the ripple increases sharply and then saturates as the duty cycle widens rather than following
the symmetric curve expected of a conventional buck-type converter, is seldom discussed explicitly, even
though the underlying capacitor charge–discharge mechanism is closely related to the filter-design questions
already studied in classical rectifier theory.
[19,21]
Fourth, when a controller fails to reach its voltage setpoint,
the distinction between a genuine control-design fault and a structural limitation of the rectifier topology and
source voltage is not always drawn explicitly; this study treats that distinction as a central part of its
analysis.
[6,7]
Finally, few studies combine closed-loop controller evaluation with an explicit, block-by-block
verification of low-cost switching hardware, an Arduino-class microcontroller, gate drivers, and a MOSFET
bridge, which is demonstrated in adjacent Arduino/Proteus-based embedded power-control work.
[16-18,22]
Motivated by this gap, the present study designs and evaluates, entirely through circuit-level simulation, a
Mamdani FLC for PWM duty-cycle control of a three-phase synchronous MOSFET rectifier in a low-speed
Wind Power Generation Plant (WPGP). The closed-loop performance of the controller is assessed through
Proteus simulation across duty-cycle and input-voltage variations under both resistive and resistive–
inductive loads, while the Arduino UNO, the IR2110 gate drivers, and the MOSFET bridge are implemented
and exercised within the same Proteus circuit model, extending the kind of embedded, low-cost simulation
reported in comparable Arduino/Proteus power-electronics studies.
[16,17,22]
The contributions of this study are
threefold: (i) a Mamdani FLC design for three-phase synchronous-rectifier duty-cycle regulation, positioned
against recent PI-versus-fuzzy and type-2/type-3 fuzzy comparisons on related converters;
[14,24,25]
(ii) a
systematic, simulation-based characterization of how the duty cycle, input voltage, and load type jointly affect
the output voltage and ripple in an inductor-less synchronous rectifier, including the ripple-plateau behavior
noted above and left largely unaddressed in the classical rectifier-filtering literature;
[19,21]
and (iii) an explicit
separation of controller performance from the structural voltage-conversion limits imposed by the topology
and the available AC source, a distinction that recent low-speed and low-voltage WECS studies increasingly
emphasize when a setpoint is not reached.
[6,7,9]
Given that the control method was limited to Type-1 fuzzy
logic, all the data presented in this study are based solely on Proteus simulation results; full integration with
the wind power plant unit was not achieved because of material constraints, necessitating independent
testing using a three-phase AC source.
2. Materials and methods
2.1 System architecture and operating principles
The complete WPGP system comprises a Savonius-type wind turbine (0.8 m blade height, 13–15 kg, rated
800–1000 W) coupled to a 1000 W, 48 V three-phase permanent-magnet synchronous generator (PMSG); a
three-phase PWM synchronous rectifier (the focus of this study); a buck converter stepping the rectified 48
VDC down to 27 VDC for battery charging; and a single-phase inverter supplying the load (Fig. 1), following
the generator–rectifier–conditioning–load chain typical of low-speed PMSG-based WECS installations.
[6,10]
Fig. 1: Block diagram of the complete low-speed WPGP system.
Within the rectifier stage, the control objective is to keep the DC output close to a 48 V setpoint, matching the
PMSG’s rated voltage. The signal path is as follows: three-phase AC source/generator → synchronous MOSFET
rectifier → output filter capacitor → resistive (R) or resistive–inductive (R–L) load, with a voltage-sensing
divider feeding the rectified output back to an Arduino UNO, which runs the Mamdani fuzzy logic controller
(FLC) and issues the corrected PWM duty cycle to the three IR2110 gate drivers and, in turn, the six-switch
MOSFET bridge. The controlled variable is therefore the rectified DC output voltage, and the manipulated
variable is the PWM duty cycle applied to the bridge. A structural feature of the topology is the absence of a
series filter inductor between the switched bridge and the output capacitor, a condition that is central to the
ripple behavior analyzed in Section 3.4. Both purely resistive loads and resistive–inductive loads were used to
exercise the rectifier, the latter representing the downstream single-phase inverter stage of the complete
WPGP system, which is consistent with the closed-loop voltage-sensing feedback structure used in
comparable PMSG-rectifier DVC designs.
[13]
2.2 Three-Phase synchronous rectifier design
The 3-phase PWM rectifier consists of a PCB, MOSFET semiconductors, a capacitor filter, and control
components comprising an Arduino UNO and a driver IC. A MOSFET is a device controlled by a gate-source
voltage to maintain conduction, characterized by very short switching times—ranging from tens to hundreds
of nanoseconds.
[30]
The capacitor serves to eliminate the voltage ripple in the DC output caused by the
sinusoidal current draw.
[21]
The PCB acts as an electromechanical platform that interconnects the electronic
components.
[15]
The Arduino UNO is a microcontroller board programmed via the Arduino IDE using C/C++.
[17]
The IR2110 driver IC is a high-voltage, high-speed MOSFET/IGBT driver featuring independent high-side
and low-side output channels capable of driving N-channel MOSFETs/IGBTs up to 500–600 volts in a high-
side configuration.
[18].
The rectifier stage uses six IRFP460 MOSFETs (500 V/20 A rating), providing a voltage
and current margin above the PMSG’s 48 V, 1000 W nameplate rating arranged as a six-switch synchronous
bridge, three IR2110 high/low-side gate-driver ICs with bootstrap circuits, and a 6800 μF/63 V output filter
capacitor (sized from the target 6% ripple at 2000 W). Switching is generated by an Arduino UNO, which
reads the rectified output through a 120 kΩ/10 kΩ voltage divider and issues 5 kHz, 120°-phase-shifted PWM
signals (2 μs dead time) to the three gate-driver legs, with the MOSFET current rating, output-capacitor value,
and interleg dead time size using standard switching-converter design practices.
[19,30]
The rectifier was
exercised at AC input voltages of 48 V (the PMSG’s rated output) and 36 V (representing a reduced wind-
speed condition) across three resistive loads (450, 650, and 1000 Ω) and three resistive–inductive loads (323,
645, and 1936 Ω).
2.3 Fuzzy logic controller (FLC) design
The closed-loop control structure (Fig. 2) compares the sensed rectifier output against a 48 V setpoint,
matching the generator's rated voltage, to obtain a voltage error, which the Arduino process with a Mamdani-
type FLC to command the PWM duty cycle. The internal architecture of the FLC block is shown in Fig. 2(b): the
voltage error e(t) and the delta error Δe are fuzzified with the membership functions plotted in the same
figure, the 15 rules of Table 1 are evaluated with MIN inference and combined by MAX aggregation, and the
aggregated result is defuzzified by the centroid (weighted-average) method to give the duty-cycle correction
ΔD, which is added to the running duty cycle before it is applied as the PWM command.
Fig. 2: Closed-loop control block diagram. (a) Closed-loop block diagram (upper panel); (b) architecture of the
Mamdani FLC showing the inputs, fuzzification block, 5 × 3 rule base, defuzzification, and the membership functions
of e, Δe, and ΔD (lower panel).
Table 1: Fuzzy rule base (15 rules)
Error (e) \ Delta error (Δe)
Negative (N)
Zero (Z)
Positive (P)
Negative Big (NB)
BI
BI
SI
Negative Small (NS)
BI
SI
S
Neutral (N)
SI
S
SD
Positive Small (PS)
S
SD
BD
Positive Big (PB)
SD
BD
BD
The Mamdani method was selected over Sugeno, Tsukamoto, or type-2 fuzzy variants because its linguistic IF-
THEN rules can be verified manually without an auxiliary consequent function, which is valuable for a system
whose overall closed-loop behavior had not previously been characterized, which is consistent with reported
comparisons showing that Mamdani inference is more transparent and easier to validate against expected
control action than Sugeno-type systems in similar power-electronic control problems.
[31]
Two inputs are
used, namely, the voltage error e(t), which is classified into five sets (negative Big, negative Small, neutral,
positive Small, and positive Big) over ±10 V, given by



(1)
and delta error Δe, classified into three sets (negative, zero, positive) over ±5 V, given by
    (2)
(a)
(b)
where e(t−1) is the voltage error from the previous control cycle. The coarser 3-level resolution on Δe keeps
the rule base to 5×3 = 15 rules rather than 25, limiting the computational load on the Arduino UNO for a 100
ms control cycle, while the finer 5-level output resolution and duty-cycle change ΔD, from Big Decrease to Big
Increase over ±30%, allows large corrections far from the setpoint and fine corrections near it, since the
output is added incrementally to the running duty cycle each cycle. Inference uses MIN/MAX composition
with centroid (weighted-average) defuzzification, which is the standard combination for Mamdani-type
controllers; the seed duty cycle is 74%.
[31]
Membership functions: All the membership functions used for the error, delta-error, and duty-cycle-
correction variables are triangular or trapezoidal; their linguistic sets and numerical ranges are summarized
in Table 2. The triangular and trapezoidal membership functions are plotted in Fig. 2(b).
Table 2: Fuzzy input and output linguistic sets used in the Mamdani FLC
Variable
Range
Voltage error, e (V)
−10 to −6
−6 to −1
−1 to +1
+1 to +6
+6 to +10
Delta error, Δe (V)
−5 to −1
−1 to +1
+1 to +5
Duty-cycle correction, ΔD (%)
−30 to −10
−10 to −1
−1 to +1
+1 to +10
+10 to +30
2.4 Fuzzy rule base and inference process
The complete 5×3 rule base, mapping the voltage error and delta error to the duty-cycle correction, is given in
Table 1. For each control cycle, the firing strength of every rule is computed as the minimum of the two input
membership degrees (MIN composition); the fifteen weighted contributions are then combined by a weighted
average of their output centers (Table 2) to obtain the crisp duty-cycle correction, which is added to the
running duty cycle and clamped to the 30–95% safe operating range described in Section 2.3. Prior to being
embedded in the circuit-level model, the rule base and defuzzification logic were sanity-checked in MATLAB
at three representative operating points, summarized in Table 3, to confirm that the controller’s output
direction and magnitude were physically sensible ahead of the closed-loop Proteus evaluation reported in
Section 3.
Table 3: Fuzzy rule-based verification in MATLAB (three representative test cases)
Case
V(t) (V)
V(t−1) (V)
Error e
Delta error Δe
Output ΔD
Voltage drop
45
48
3
3
+22.4% (increase duty)
Voltage rise
50
45
−2
−5
−18.3% (decrease duty)
Voltage steady
50
50
−2
0
−6.36% (decrease duty)
2.5 Proteus simulation setup
To allow the simulation to be replicated, the Proteus model represented the three-phase AC source at 48 V
(rated) and 36 V (reduced wind-speed condition), the six IRFP460 MOSFETs and three IR2110 gate drivers
described in Section 2.2, and the 6800 μF output capacitor. The load bank comprised the same three resistive
(450, 650, 1000 Ω) and three resistive–inductive (323, 645, 1936 Ω) conditions used in the simulation runs.
The switching frequency (5 kHz), dead time (2 μs), and 30–95% duty-cycle clamp matched the Arduino
firmware values. Two protocols were run: an open-loop duty-cycle sweep at a fixed VAC = 48 V with the duty
cycle manually set to 30%, 50%, 74%, and 95% (Section 3.3) and a closed-loop fuzzy-control sweep with the
48 V setpoint held fixed at VAC = 48 V and 36 V (Section 3.5). Each condition was run until the output voltage
and ripple waveform reached a repeating steady-state pattern before Vmax, Vmin, Vdc, and the ripple factor
were recorded at the rectifier output/capacitor node.
3. Results and discussion
3.1 Proteus circuit-level implementation
The complete switching stage, comprising the Arduino UNO PWM generator, the three IR2110 high/low-side
gate drivers with bootstrap circuits, and the six-switch IRFP460 MOSFET bridge, was implemented as a single
Proteus schematic (Fig. 3) so that the fuzzy-corrected PWM duty cycle drives the switching bridge entirely
within the simulation environment. The 5 kHz, 120°-phase-shifted switching pattern with a 2 μs dead time
described in Section 2.2 was applied to the three gate-driver legs in this model, and the switching verification,
open-loop, and closed-loop results reported in Sections 3.2–3.5 were obtained directly from this Proteus
circuit.
Fig. 3: Proteus schematic of the three-phase synchronous MOSFET rectifier circuit, including the gate-driver stage,
output voltage/current meters, and resistive–inductive load branch.
The rectifier was exercised under two categories of load, matching the resistive and resistive–inductive
conditions used throughout Sections 3.3–3.5. A resistive (R) load consists solely of a resistor, so the load
current tracks every change in the applied voltage instantaneously and in phase. A resistive–inductive (R–L)
load instead combines a series resistor and inductor; because the inductor opposes any abrupt change in
current (v = L di/dt), the load current responds more gradually than the load voltage does and lags it in phase,
which is representative of the downstream single-phase inverter stage that the rectifier ultimately supplies.
Table 4 lists the three resistive and three resistive–inductive conditions used in the open-loop duty-cycle
sweep, the input-voltage sweep, and the closed-loop fuzzy-control tests reported below.
Table 4: Resistive and resistive–inductive load conditions used in the rectifier tests
Load type
Resistance/Impedance (Ω)
Resistive (R)
450
Resistive (R)
650
Resistive (R)
1000
Resistive–Inductive (R–L)
323
Resistive–Inductive (R–L)
645
Resistive–Inductive (R–L)
1936
3.2 Proteus-based PWM and switching verification
Before evaluating the open-loop and closed-loop electrical performance of the rectifier, the switching stage
itself, the Arduino UNO PWM generator, the three IR2110 gate-driver legs, and the six-switch MOSFET bridge,
was checked block-by-block within the Proteus model to confirm that the PWM command issued by the
Arduino UNO was correctly reproduced as complementary high-side (HO) and low-side (LO) gate signals
before being applied to the power stage.
The representative HO/LO waveforms captured at the output of each of the three IR2110 gate drivers are
shown in Fig. 4. Each panel spans three consecutive periods of the 5 kHz carrier (T = 200 μs), so the HO/LO
pulses recur once per switching period; they are therefore PWM pulse trains rather than a single pulse, and
the pulse width relative to T is the duty cycle commanded by the Arduino UNO. The corresponding reference
PWM timings of one phase leg for duty cycles of 30, 50, 74, and 95% are shown in Fig. 4(d), in which HO and
LO are complementary and separated by the 2 μs dead time, and the pulse width increases with the number of
commanded duty cycles. In all three-phase legs, HO and LO are pulsed rather than sinusoidal, tracking the
commanded PWM pattern, and no interval was found in which both outputs were simultaneously high; the
brief low interval separating each HO-to-LO and LO-to-HO transition corresponds to the 2 μs dead time
specified in Section 2.2. Because no overlapping high/low-side conduction, and consequently no overshoot,
was observed on any of the three legs, this simulated verification indicates that the IR2110 driver stage and
its bootstrap circuit reproduce the intended dead-time behavior needed to prevent shoot-through in the
MOSFET bridge, supporting the validity of the switching hardware model used to obtain the open-loop and
closed-loop results reported in Sections 3.3–3.5.
Fig. 4: Representative IR2110 gate-driver output waveforms (HO/LO) from Proteus switching verification: (a)
phase leg A; (b) phase leg B; (c) phase leg C. (d) Reference PWM timing diagram of one phase leg (HO/LO) at duty
cycles of 30, 50, 74 and 95%.
3.3 Open-Loop characteristics under duty-cycle variation
Table 5 summarizes the effect of the duty cycle variation (at VAC = 48 V) on the output voltage, and Table 6
summarizes the corresponding ripple factor, which is averaged across the six load conditions. The average
output voltage and ripple factor are plotted against the duty cycle in Fig. 5, where the dashed line indicates the
theoretical output voltage Vdo.
Fig. 5: Average output voltage and ripple factor versus duty cycle (VAC = 48 V).
(a) Phase Leg A
(b) Phase Leg B
(c) Phase Leg C
(d)
The theoretical DC output limit of a three-phase full-wave rectifier is as follows:



(3)
At the rated input voltage (VAC = 48 V), Vdo = 1.35 × 48 = 64.8 V; the reference values are listed in the “Vdo
theory” column of Table 5.
Table 5: Effect of duty cycle variation on the rectifier output voltage (VAC = 48 V)
Duty (%)
Vmax (V)
Vmin (V)
Vdc avg. (V)
Vdo theory (V)
Error vs. theory (%)
30
66.1–66.4
61.4–62.9
64.4
64.8
+0.5 to +2.5
50
65.6–66.2
47.8–49.8
57.3
64.8
+1.2 to +2.2
74
65.0–65.8
46.7–48.8
56.5
64.8
+0.3 to +1.5
95
64.7–65.8
46.0–48.0
55.9
64.8
−0.2 to +1.5
The ripple factor was computed as follows:






(4)
then







 (5)
For example, at 50% duty on the 450 Ω load (Vmax = 66.2 V, Vmin = 49.8 V), Ripple RMS = (66.2 −
49.8)/(2√3) = 4.73 V, yielding a ripple factor of 4.73/58.0 = 8.2%, which is consistent with the values
reported in Table 6.
Table 6: Effect of duty cycle variation on the ripple factor (VAC = 48 V; RF theory for an unfiltered 6-pulse rectifier
= 4.2%)
Duty (%)
Ripple p-p (V)
Ripple RMS (V)
Ripple factor (%)
30
3.2–4.8
0.92–1.39
1.4–2.2
50
16.2–18.4
4.73–5.14
8.2–9.1
74
16.6–18.6
4.82–5.37
8.4–9.6
95
17.3–18.8
4.99–5.43
8.8–9.8
As depicted in Fig. 5, the peak voltage remained essentially constant across all duty cycles (64.7–66.4 V) and
close to the theoretical Vdo = 64.8 V, confirming that Vmax is set by the natural peak of the six-pulse rectified
waveform rather than by the duty cycle itself. In contrast, Vmin decreases sharply as the number of duty
cycles increases from 30% to 50% and then decreases only gradually to 95%, which drives the corresponding
decrease in average Vdc; therefore, the relationship between Vdc and the duty cycle is not the simple linear
Vdc = D × Vdo expected of a buck-type converter; Vmax remains locked at the natural peak value of the
rectifier, while the duty cycle determines how deeply Vmin is allowed to decrease during each switching cycle.
This trend is broken down by individual load, as shown in Fig. 6, which compares the three resistive (R)
conditions against the three resistive–inductive (R–L) conditions. Both load types trace the same duty cycle
dependence; the initial voltage decreases from 30% to 50% duty, followed by a shallow decline through 95%,
and the R and R–L curves remain within approximately 1 V of each other at every duty cycle. This finding
indicates that the output-voltage behavior is governed by the switching pattern and rectifier topology rather
than by whether the load draws current resistively or through a series inductor.
Fig. 6: Output voltage versus duty cycle, broken down by individual load: (a) resistive (R) loads; (b) resistive–
inductive (R–L) loads.
3.4 Ripple-Plateau analysis
Ripple follows the same two-stage pattern: a sharp increase from 1.4–2.2% at 30% duty to a plateau of 8.2–
9.8% from 50% to 95% duty, rather than the symmetric, D(1−D)-shaped ripple curve of a classical buck
converter that would peak at D = 50% and decrease again toward D = 0% and 100%. This is consistent with
the rectifier's topology, which has no series filter inductor: the output capacitor is exposed directly to the
switched bus, so it charges quickly and then decays for a duration set by the switch's off-time within each 60°
commutation window. As the duty cycle widens, the capacitor is allowed to decay for longer before
recharging, increasing the ripple until the decay is instead bounded by the fixed 60° commutation window
rather than by the duty cycle, resulting in the observed plateau. Because the ripple at a duty ≥50% is 4–6
percentage points above the theoretical six-pulse ceiling (~4.2%), the excess ripple originates from the
interaction between the PWM conduction window and the natural six-pulse waveform, not from the
rectification process itself. The same ripple-plateau pattern broken down by individual load is shown in Fig. 7.
The resistive and resistive–inductive conditions increase from approximately 1.4–2.2% at 30% duty to the 8–
10% plateau at a duty ≥50%, and the two load types remain interleaved rather than separating into distinct
bands at any duty cycle. This confirms that the ripple mechanism described above is set by the capacitor's
charge–discharge interaction with the PWM conduction window, not by the load's resistive or resistive–
inductive character.
Fig. 7: Ripple factor versus duty cycle, broken down by individual load: (a) resistive (R) loads; (b) resistive–
inductive (R–L) loads.
This transition is illustrated directly with representative Proteus oscilloscope traces from the same rectifier
node (horizontal axis: time in ms; vertical axis: output voltage in V) in Fig. 8: Panel (a) shows the relatively flat
output at 30% open-loop duty (ripple factor 1.4–2.2%), whereas Panel (b) shows the pronounced sawtooth-
shaped ripple recorded once the closed-loop controller settles near its steady-state duty cycle at VAC = 48 V
(ripple factor 8.2–9.8%). The visibly deeper and more frequent discharge notches in panel (b) are direct
simulation evidence for the capacitor charge–discharge mechanism described above.
Fig. 8: Representative Proteus oscilloscope waveforms showing the ripple‒plateau transition: (a) low-ripple open-
loop condition at 30% duty; (b) high-ripple closed-loop steady state at VAC = 48 V. Horizontal axis: time (ms), 1
ms/div; vertical axis: output voltage (V), 20 V/div; the cyan line indicates the 0 V reference.
(a)
(b)
3.5 Closed-Loop FLC performance under input voltage variation
Table 7 compares the closed-loop fuzzy control performance at the two tested input voltages. The average
output voltage and ripple factor at each input voltage are plotted in Fig. 9. The same theoretical relation
applies at the reduced input voltage: Vdo = 1.35 × 36 = 48.6 V; the reference against which the VAC = 36 V row
in Table 7 is compared.
Table 7: Closed-loop fuzzy control performance at VAC = 48 V and 36 V
VAC (V)
Vdo theory (V)
Vdc avg. (V)
Vmin/VAC ratio
Ripple factor avg. (%)
48
64.80
64.94
0.984
9.2
36
48.60
46.79
0.988
7.9
Fig. 9: Average output voltage and ripple factor versus input voltage VAC under closed-loop fuzzy control.
Under closed-loop fuzzy control, the system regulated close to the 48 V setpoint at VAC = 48 V (Vmin/VAC =
0.984) but pushed the duty cycle toward its maximum at VAC = 36 V (Vmin/VAC = 0.988) because the
theoretical ceiling at that input (Vdo = 48.6 V) leaves the controller no margin to reach 48 V through duty
cycle adjustment alone; the fuzzy logic responded correctly to the available error signal in both cases. This
finding indicates that the unmet setpoint at a low input voltage is a structural limitation of the inductor-less
synchronous rectifier topology, not a fuzzy-controller design fault, since the peak voltage is fixed by the AC
source (bridged through the MOSFET body diodes), whereas the minimum voltage is bounded by the fixed
commutation window rather than by the duty cycle. Addressing this would likely require an explicit
chopper/switching stage that separates the rectification and voltage-regulation functions, for example, a
series LC filter combined with a redesigned freewheeling scheme, rather than simply adding filter
components to the existing switching arrangement.
4. Conclusion
In this study, a Mamdani-based fuzzy logic controller for PWM duty cycle regulation of a three-phase
synchronous MOSFET rectifier intended for a low-speed wind power generation prototype was designed and
evaluated using a Proteus circuit-level simulation with the rule base of the controller further sanity checked in
MATLAB. In the complete switching stage, the Arduino UNO PWM generator, IR2110 gate drivers, and
MOSFET rectifier bridge were implemented and exercised entirely within a Proteus circuit-level model, and a
closed-loop Proteus simulation revealed that the fuzzy controller regulates the output voltage close to the 48
V setpoint when the input voltage permits it (VAC = 48 V) and otherwise saturates the duty cycle
appropriately when the setpoint is structurally unreachable (VAC = 36 V). The peak output voltage tracked
the theoretical six-pulse value (64.8 V) regardless of the duty cycle, whereas the ripple sharply increased from
1.4–2.2% at 30% duty to an 8.2–9.8% plateau at a duty ≥50%, which was attributed to the absence of a series
filter inductor. These findings indicate that the observed setpoint shortfall reflects a structural limitation of
the rectifier topology rather than a flaw in the fuzzy control design and point to the addition of a properly
codesigned LC output filter as the most direct path to close the gap in future work.
Acknowledgment
The authors thank the Electrical Power Systems Study Program, Department of Electrical Engineering, State
Polytechnic of Malang, for laboratory access and support during this research.
CRediT Author Contribution Statement
Ika Noer Syamsiana: Project administration, Supervision, Validation, Writing – Review & editing.
Muhammad Akmal Nashiry: Conceptualization, Data curation, Formal analysis, Investigation, Methodology,
Software, Visualization, Writing – Original draft. Harrij Mukti Khristiana: Supervision, Validation, Writing –
Review & editing. Arwin Datumaya Wahyudi Sumari: Data Curation, Project Administration, Resources,
Software. All authors have read and approved the final version of the manuscript for publication and agree to
be accountable for all aspects of the work, ensuring that questions related to the accuracy or integrity of any
part of the work are appropriately investigated and resolved.
Funding Declaration
This research did not receive any specific grant from funding agencies in the public, commercial, or not-for-
profit sectors.
Data Availability Statement
The datasets generated and/or analyzed during the current study that support the findings are available from
the corresponding author upon reasonable request.
Conflict of Interest
There is no conflict of interest.
Artificial Intelligence (AI) Use Disclosure
The authors declare that artificial intelligence (AI)-assisted tools were used only for language refinement,
grammar improvement, and manuscript structuring purposes during the preparation of this work. All
technical content, experimental implementation, results, and interpretations were independently developed
and verified by the authors.
Supporting Information
Not applicable.
References
[1]
A. Lubis, Energi terbarukan dalam pembangunan berkelanjutan, Jurnal Teknologi Lingkungan BPPT,
2007, 8, 151118, doi: 10.29122/jtl.v8i2.420.
[2]
Kementerian ESDM, RUPTL PT PLN (Persero) tahun 2025–2034: Materi konferensi pers. Kementerian
Energi dan Sumber Daya Mineral Republik Indonesia, 2025,
https://jdih.esdm.go.id/dokumen/download?id=2025abskesdm188k.pdf.
[3]
N. A. Pambudi, D. K. Ulfa, I. R. Nanda, I. M. Gandidi, A. Wiyono, M. K. Biddinika, B. Rudiyanto, L. H. Saw,
The future of wind power plants in Indonesia: Potential, challenges, and policies, Sustainability, 2025,
17, 1312, 2025, doi: 10.3390/su17031312.
[4]
Y. Tanoto, L. Diprasetya, N. Enano Jr., H. S. Warpindyasmoro, Utility-scale wind power generation
potential in low-wind regions: Insights for achieving the sustainable energy transition in developing
countries, International Journal of Renewable Energy Development, 2026, 15, 584–595, doi:
10.61435/ijred.2026.61756.
[5]
A. D. Cahyo, R. M. Fatwah, Utilization of a low-speed neodymium wind turbine generator as an
alternative power source for homes in the North Cirebon coastal area, Indonesia, Malaysian Journal of
Science and Advanced Technology, 2024, 4, 316–321, doi: 10.56532/mjsat.v4i3.352.
[6]
A. Alili, M. B. Camara, B. Dakyo, Vienna rectifier-based control of a PMSG wind turbine generator,
Processes, 2022, 10, 413, doi: 10.3390/pr10020413.
[7]
M. A. Hannan, A. Q. Al-Shetwi, M. S. Mollik, P. J. Ker, M. Mannan, M. Mansor, H. M. K. Al-Masri, T. M. I.
Mahlia, Wind energy conversions, controls, and applications: A review for sustainable technologies and
directions, Sustainability, 2023, 15, 3986, doi: 10.3390/su15053986.
[8]
Y. K. Teklehaimanot, F. K. Akingbade, B. C. Ubochi, T. O. Ale, A review and comparative analysis of
maximum power point tracking control algorithms for wind energy conversion systems, International
Journal of Dynamics and Control, 2024, 12, 3494–3516, doi: 10.1007/s40435-024-01434-3.
[9]
W. K. Ntuli, M. Kabeya, K. Moloi, Review of low voltage ride-through capabilities in wind energy
conversion systems, Energies, 2024, 17, 5321, doi: 10.3390/en17215321.
[10]
D. B. Tchoumtcha, C. T. Sanjong Dagang, G. Kenne, Synergetic control for stand-alone permanent
magnet synchronous generator driven by variable wind turbine, International Journal of Dynamics and
Control, 2024, 12, 2888–2902, doi: 10.1007/s40435-024-01384-w.
[11]
B. N. Reddy, R. Jalli, K. S. Prudhviraj, K. B. Shetty, C. R. Reddy, H. Kotb, A. Emara, M. Alruwaili, Wind
turbine with line-side PMSG-fed DC-DC converter for voltage regulation, PLOS ONE, 2024, 19,
e0305272, doi: 10.1371/journal.pone.0305272.
[12]
I. Batarseh, A. Harb, Uncontrolled Diode Rectifier Circuits. InPower Electronics: Circuit Analysis and
Design, Cham: Springer International Publishing, 2017, 461-524, doi: 10.1007/978-3-319-68366-9_7.
[13] Y. Saidi, A. Mezouar, Y. Miloud, M. A. Benmahdjoub, M. Yahiaoui, Fuzzy logic based robust DVC
design of PWM rectifier connected to a PMSG WECS under wind/load disturbance conditions,
International Journal of Energetica, 2019, 4, 2543–3717.
[14]
R. Coteli, M. Uyar, A. Mohammadzadeh, Evaluation of dynamic response and power quality performance
in type-3 fuzzy logic controlled PWM rectifiers, Electronics, 2026, 15, 1639, doi:
10.3390/electronics15081639.
[15]
F. Perdigones, J. M. Quero, Printed circuit boards: The layers’ functions for electronic and biomedical
engineering, Micromachines, 2022, 13, 460, doi: 10.3390/mi13030460.
[16]
L. Cohen, J. B. Bernstein, I. Aharon, A bipolar current source resonant gate driver for GaN-driven SiC
power devices, Electronics, 2025, 14, 224, doi: 10.3390/electronics14020224.
[17]
E. Pratidhina, H. Kuswanto, D. Rosana, Penggunaan Arduino Uno dan Common-Coding pada Percobaan
Fisika Materi Kelistrikan, Cipta Media Nusantara, 2021.
[18]
International IOR Rectifier, IR2110(S)PbF/IR2113(S)PbF datasheet,
https://www.infineon.com/assets/row/public/documents/24/49/infineon-ir2110-datasheet-en.pdf,
Accessed 20 August 2026.
[19]
M. H. Rashid, Power electronics: Devices, circuits, and applications, 4th ed, Pearson, 2014.
[20]
Z. Zhou, J. Song, Y. Yu, Q. Xu, X. Zhou, Research on high-quality control technology for three-phase PWM
rectifier, Electronics, 2023, 12, 2417, doi: 10.3390/electronics12112417.
[21]
S. Liao, P. Dourmashkin, J. W. Belcher, MIT physics 8.02: Electricity and magnetism. Massachusetts
Institute of Technology, 2004.
[22]
M. Bathre, P. K. Das, Design and implementation of a fuzzy-logic-based hybrid power management
system for self-powered wireless sensor nodes using Arduino Mega 2560 and Proteus, Journal of
Energy Storage, 2024, 97, 112961, doi: 10.1016/j.est.2024.112961.
[23]
G. Nethaji, J. Kathirvelan, Hardware implementation and comparison of PID and fuzzy logic controllers
for a DC-DC boost converter for renewable energy applications, Heliyon, 2024, 10, e36750, doi:
10.1016/j.heliyon.2024.e36750.
[24]
A. Daraz, A. Basit, G. Zhang, Performance analysis of PID controller and fuzzy logic controller for DC-DC
boost converter, PLOS ONE, 2023, 18, e0281122, doi: 10.1371/journal.pone.0281122.
[25]
M. Bahgat, M. Ezzat, M. A. Attia, S. F. Mekhamer, N. M. Elbehairy, Comparative analysis of PI and fuzzy
logic controller for grid connected wind turbine under normal and fault conditions, Scientific Reports,
2025, 15, 1954, doi: 10.1038/s41598-024-85073-w.
[26]
Y. Saidi, A. Mezouar, Y. Miloud, M. A. Benmahdjoub, A Robust Control Strategy for Three Phase Voltage t
Source PWM Rectifier Connected to a PMSG Wind Energy Conversion System, 2018 International
Conference on Electrical Sciences and Technologies in Maghreb (CISTEM), Algiers, Algeria, 2018, 1-6,
doi: 10.1109/CISTEM.2018.8613359.
[27]
A. Taibi, K. Hartani, T. M. Chikouche, N. Aouadj, Fuzzy logic-based DPC for PWM rectifiers: Enhancing
power quality and advancing the sustainable development goals, Journal of Lifestyle and SDGs Review,
2025, 5, e06118, doi: 10.47172/2965-730X.SDGsReview.v5.n04.pe06118.
[28]
K. N. Khallouf, Z. Laid, H. Benbouhenni, N. Debdouche, Z. M. S. Elbarbary, Adaptive fuzzy logic control
for microgrid-connected hybrid photovoltaic/wind generation systems, Energy Reports, 2024, 12,
4741–4756, doi: 10.1016/j.egyr.2024.10.042.
[29]
S. Karthikeyan, C. Ramakrishnan, A hybrid fuzzy logic-based MPPT algorithm for PMSG-based variable
speed wind energy conversion system on a smart grid, Energy Storage and Saving, 2024, 3, 295–304,
doi: 10.1016/j.enss.2024.08.001.
[30]
N. Mohan, T. M. Undeland, W. P. Robbins, Power electronics: Converters, applications, and design, 2nd
ed. John Wiley & Sons, 1995.
[31]
T. Samavat, M. Nazari, M. Ghalehnoie, M. Azimi Nasab, M. Zand, P. Sanjeevikumar, B. Khan, A
comparative analysis of the Mamdani and Sugeno fuzzy inference systems for MPPT of an islanded PV
system, International Journal of Energy Research, 2023, 2023, 7676113, doi: 10.1155/2023/7676113.
Publisher Note: The views, statements, and data in all publications solely belong to the authors and
contributors. GR Scholastic is not responsible for any injury resulting from the ideas, methods, or products
mentioned. GR Scholastic remains neutral regarding jurisdictional claims in published maps and institutional
affiliations.
Open Access
This article is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License,
which permits the non-commercial use, sharing, adaptation, distribution and reproduction in any medium or
format, as long as appropriate credit to the original author(s) and the source is given by providing a link to the
Creative Commons License and changes need to be indicated if there are any. The images or other third-party
material in this article are included in the article's Creative Commons License, unless indicated otherwise in a
credit line to the material. If material is not included in the article's Creative Commons License and your
intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain
permission directly from the copyright holder. To view a copy of this License, visit:
https://creativecommons.org/licenses/by-nc/4.0/
© The Author(s) 2026